top of page
Checklist : The Indy Is Ready To Leave
-
​Place Into Deck Locker #2 Port Side
-
Dodger Cover Removed
-
Flood Lights On Boom Removed
-
Steering Wheel Cover
-
Table Cover
-
Owl On Boom
-
-
Place Into Table Center Storage​
-
All Navigation Covers​
-
Navigation On From Nav Station Below Deck
-
-
Deck Locker #1 Starboard Side
-
Spring Line Removed
-
Port Line Removed
-
- Spinnaker Halyard Moved To Mast from Bow
- Dock Cleared with Steps Moved Back
- Sheet Lines and Furler Line Uncoiled
-
Bow Line & Stern Line Looped Back Ready​
-
Engine Started
-
Bow Thrusters Enabled/Tested

bottom of page